SWMS and safety docs for concreters

Do concreters need a SWMS?

Yes, on most pours. Concrete pumps and trucks moving around site, crossovers next to live traffic, footings deeper than 1.5 metres and any tilt-up or precast work are high risk construction work, so a SWMS is needed before the work starts.

High risk work that comes up for concreters

These are the high risk construction work categories concreters run into most. If a job includes any of them, a SWMS is needed before the work starts.

High risk construction workWhere it comes up
Powered mobile plant moving around
Work that is carried out in an area at a workplace in which there is any movement of powered mobile plant.
Pumps, agitators, bobcats and trucks on site.
Next to roads or other traffic
Work that is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians.
Crossovers, footpaths and kerbs next to a road in use.
Trenches or shafts deeper than 1.5 metres, or tunnels
Work that is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel.
Deep footings and piers.
Tilt-up or precast concrete
Work that involves tilt-up or precast concrete.
Tilt-up panels and precast elements.
Falls of more than 2 metres
Work that involves a risk of a person falling more than 2 metres.
Edges of suspended slabs and formwork decks.

What we would put in your Trade Pack

The Trade Pack is 5 SWMS covering the jobs you do most: $299 Ready to Go, or $795 Fully Custom, including GST. For concreters, these five are a common starting point. Swap any of them for the work you do most.

  1. Concrete pumping and placing
  2. Driveways and crossovers next to traffic
  3. Footings and deep excavation
  4. Cutting and grinding (silica dust)
  5. Formwork and suspended slab edges

Other docs concreters ask for

  • SOPs for pour day, curing and saw cutting
  • An induction pack for labourers
  • A staff handbook for a growing crew

Worth knowing

Saw cutting and grinding concrete creates silica dust. The model WHS laws have their own rules for processing materials that contain crystalline silica: you assess whether the work is high risk and, if it is, you need a silica risk control plan or a SWMS that covers it.

Prices

DocReady to GoFully Custom
Single SWMS: One high risk task or job$79$195
Trade Pack: 5 SWMS covering the jobs you do most$299$795
WHS Starter Kit: Safety policy, risk register, incident forms, toolbox talk template$299$895
Single SOP: One process, step by step$59$95
SOP Manual: Up to 10 SOPs: quoting, onboarding, equipment checks and more$449$995
Induction Pack: Induction checklist, sign-off sheet and site rules$59$195
Staff Handbook: Policies, expectations and the way you do things$359$495
Safety Checklist Pack: Site inspection, vehicle and plant pre-start and end-of-day pack-up checklists$49$195
Onsite Safety Audit: We look at how the work is done, check it against your paperwork and give you a written list of what to fixNot offered$495

Prices include GST.

Other trades

Builders and carpenters, Electricians, Plumbers and gasfitters, Painters, Landscapers, Roofers, Cleaning businesses